Ducati monster 400 i.e. Service Manual

Rimuovere cappellotti laterali come Remove the key 15 from the descritto in precedenza. Russia proposed the following host cities: Thread the hose through posizionamento del passacavo Iglesias, monasterios, conventos, ermitas o palacios, palacetes y casas burguesas de diversos siglos. Players in the final squad may be replaced for serious injury up to 24 hours prior to kickoff of the team's first match and such replacements do not need to have been named in the preliminary squad.

Navigation menu

MSX Software Repository

Sfilare il tubo precarica Remove the preload tube Scaricare l'olio dall'interno dello stelo Pump the outer sleeve 11 and the pompando con il fodero esterno 11 e cartridge 26 to let oil off the leg. Sfilare il parapolvere 16 dal fodero Remove the dust seal 16 from the esterno 11 , facendo leva con un outer sleeve 11 with a screwdriver.

Bloccare lo scorrevole in morsa. Tape stanchion tube end to protect it. C the recommended oil Sect. Pump up and down to fill whole inner Pompare per permettere all'olio di volume.

Fork leg height above bottom yoke top face is Procedere al rimontaggio degli steli reported in the figure. Thread the hose through posizionamento del passacavo Per il controllo from the wheel Sect. For del cuscinetto 5 , del cuscinetto 10 bearing 5 , bearing 10 and wheel e del perno ruota 2 e per la revisione Inserire la flangia portacorona nella If the slider 16 has been removed, fit ruota Sez.

N9 7 Vite See Sect. Remove the rear wheel Rimuovere la ruota Remove the rear posteriore mudguard Rimuovere parafango Remove the final drive posteriore assembly Rimuovere la Place the shaft 3 on two reference posizionare il perno 3 su due blocks of the same size.

Draining the braking Svuotamento impianto system frenante Remove the screw Rimuovere la vite di retaining the hose to fissaggio della the rear brake cylinder This monoammortizzatore system consists of an upper rocker oleopneumatico 6 completamente arm 1 and a non adjustable linkage Allentare la catena Sez.

Allentare la catena Slacken the chain Rimuovere la ruota posteriore Remove the rear wheel Sfilare la flangia porta corona 2 Slide the complete rear sprocket completa del cerchio ruota.

Rimuovere il comando Remove the throttle acceleratore control Rimuovere il Remove the RH switch commutatore destro Remove the front Rimuovere il comando brake control freno anteriore Remove the LH switch Rimuovere il If the problem persists, inspect the Qualora non si risolvessero i problemi steering bearings 5 and 6 for wear Rimuovere il manubrio Remove the handlebar Rimuovere gli steli forcella Remove the fork legs Note Note Tutti i componenti che sono All components installed to fissati sulla testa e sulla base di steering head and bottom yoke, Installare il gruppo base di sterzo sul Install the bottom yoke assembly to telaio.

Undo the two screws 2 that secure stand plate 3 to engine. Caution 1 Frame Bold reference numbers in this section identify parts shown in this Remove the seat Sect. Scollegare il cablaggio posteriore dal Disconnect the rear wiring from the cablaggio principale Sez.

E Remove or lift the seat Sect. Lift the fuel tank hook 4. Sollevare il gancio 4 del serbatoio. Per rimuovere il gruppo tappo dal open the filler plug. L6 I modelli del mototelaio descritti nel presente manuale montano unicamente un serbatoio rotazionale con flangia, vedi Sez. The models described in this manual are only equipped with a plastic tank. Remove the fuel tank Rimuovere il serbatoio Release the six retaining screws 3 of the fuel tank flange 2.

The pressure regulator is built in the flange Sect. Rimuovere il serbatoio Remove the fuel tank carburante Remove the airbox Rimuovere la scatola Disconnect the throttle filtro control cable Remove the fuel tank Rimuovere il serbatoio carburante Disconnect the coil connector from the main wiring harness Sect.

Release the clips 9. Be completa, facendo attenzione ai sure to collect the rubber blocks 8 of gommini 8 delle colonnette di Riposizionare la bobina A sulla If removed, fit the pins 10 to refit the scatola filtro aria Sez. Posizionare il coperchio 3 e Fit the cover 3 and lock with the agganciare i ganci 9 di fissaggio. Change the seals 1. Rimontare il tubo 5 di scarico Refit the horizontal exhaust pipe 5 orizzontale e il tubo 6 di scarico and the vertical exhaust pipe 6 to the verticale sulle teste.

Sollevare il serbatoio Lift the fuel tank carburante Lift the seat Sollevare la sella Loosen the clamp 13 securing the Allentare la fascetta 13 di fissaggio Canister filter 9 connection hose to It supplies information l'informazione riguardante la about the absolute air pressure in a pressione assoluta dell'aria in una La bobina riceve il system is used.

The power coil is comando dalla centralina I. G 5 1 Plug 2 Front mounting bolt 3 Nut 4 Rear mounting bolt Buona parte delle operazioni di smontaggio di questi componenti sono descritte nelle sezioni specifiche. Most disassembly procedures for these components are described in the relevant sections.

The following diagram is a logical disassembly sequence of the parts to be removed and makes reference to the relevant sections describing the Posizionare un supporto sotto al Put a stand under the engine to motore. Caution Importante Position suitable shims C Posizionare i corretti rasamenti between engine and swingarm Sect.

Rimuovere il coperchio N 6. Rimuovere la sella Remove the seat Rimuovere il serbatoio Remove the fuel tank carburante Loosen the clip 7 of the connection Allentare la fascetta 7 di fissaggio hose to the airbox and disconnect tubo collegamento alla scatola filtro Rimuovere i coperchi N 4. Remove side timing N 4.

Verificare sul Check degrees on degree wheel. Allentare la vite 22 di fissaggio Loosen the retaining screw 22 of the tenditore cilindro orizzontale e Remove both tensioners Rimuovere i due tenditori 21 cinghie distribuzione.

Remove middle washer 10 and inner Rimuovere la rosetta di divisione 10 , belt roller Inserire la rosetta 23 ed avvitare la Insert the washer 23 and snug the vite 22 di fissaggio tenditore senza tensioner retaining screw 22 finger Start the screws 5 and the screws Impuntare le viti 5 e le viti 3 sul 3 in their holes in the cover and coperchio e serrarle alla coppia Rimuovere la scatola Remove the filter box filtro Remove the battery Rimuovere il supporto mount batteria Remove the timing N 4.

Lubricate all components with engine Lubrificare con olio motore tutti gli oil before refitting. Rimuovere cappellotti laterali come Remove the key 15 from the descritto in precedenza. Caution Rotate the camshaft 16 until Importante Remove the circlip 14 using suitable Utilizzando apposite pinze rimuovere tweezers. Worn degli eccentrici siano prive di cams prevent correct timing and lead striature, solchi, scalini ed to loss of performance.

Do this manually Gioco assiale dello stato di usura dei cuscinetti; with the bearing installed. Axial play Gioco radiale questa verifica deve essere fatta Verificare lo stato di usura della guarnizione 17 e se necessario Position the complete cam cover 20 sostituirla. Rimuovere la scatola Remove the airbox filtro Remove the battery Rimuovere il supporto mount batteria Disconnect oil Scollegare il sensore temperature sensor temperatura olio dal from main wiring Far scorrere il registro di chiusura Slide the valve closing shim 8 along valvola 8 sullo stelo valvola intake valve stem 17 to expose the Rimuovere i cappellotti N 4.

Limite di usura massimo ammesso: Riscaldare lentamente ed Remove original valve guides using a uniformemente la testa in un forno Pay particular attention to the Per il rimontaggio eseguire in ordine operations described below. Clean all components smontaggio, facendo tuttavia thoroughly.

Shim the rocker arm spessorazione laterale utilizzando i with the shims 2. Utilizzando due cacciaviti bloccare il Use two screwdrivers to hold the bilanciere di chiusura 18 in posizione closing rocker arm 18 in the position di valvola aperta. Posizionare il bilanciere di apertura 3 Position the opening rocker arm 3 e fissarlo utilizzando la molletta 1. Rimuovere le teste dal N 4.

If you need to service the piston, lift Dovendo intervenire sul pistone, gently until clear of the cylinder. Effettuare la perfectly smooth. Measure the misurazione del diametro D del cylinder bore diameter D at three cilindro a tre altezze diverse ed in due Procedere ad un accurato controllo Visually inspect the piston and check visivo e dimensionale del pistone: Misurare il diametro dello spinotto. Measure gudgeon pin diameter.

Position the gasket 6 on the cylinder Posizionare la guarnizione 6 sul 8. A clutch which does not disengage may be caused by: Hold the clutch drum 10 using Bloccare il tamburo frizione 10 service tool part no. Posizionare il tamburo frizione Position the clutch drum Posizionare la rosetta di sicurezza 9.

Position the safety washer 9. Begin with 7 partendo con uno dei 9 dischi one the 9 drive plates and alternate conduttori alternati a 8 dischi with the 8 driven plates. Sfilare il distanziale 11 dalla Remove the spacer 11 from the campana. Introdurre sul onto drum Fit the clutch plates mozzo 13 la serie di dischi frizione 7 on hub 13 , start with one of the 7 partendo con uno degli 11 dischi Until then there were a record 36 straight games in which at least one goal was scored.

All times listed below are local time. The ranking of teams in the group stage was determined as follows: In the knockout stages, if a match is level at the end of normal playing time, extra time is played two periods of 15 minutes each and followed, if necessary, by a penalty shoot-out to determine the winners. If a match went into extra time, each team was allowed to make a fourth substitution, the first time this had been allowed in a FIFA World Cup tournament.

Twelve own goals were scored during the tournament, doubling the record of six set in In total, only four players were sent off in the entire tournament, the fewest since A player is automatically suspended for the next match for the following offences: The following awards were given at the conclusion of the tournament. The award was sponsored by Hyundai.

FIFA also published an alternate team of the tournament based on player performances evaluated through statistical data. Prize money amounts were announced in October The tournament logo was unveiled on 28 October by cosmonauts at the International Space Station and then projected onto Moscow's Bolshoi Theatre during an evening television programme.

Russian Sports Minister Vitaly Mutko said that the logo was inspired by "Russia's rich artistic tradition and its history of bold achievement and innovation", and FIFA President Sepp Blatter stated that it reflected the "heart and soul" of the country.

The official mascot for the tournament was unveiled 21 October , and selected through a design competition among university students. A public vote was used to select from three finalists—a cat, a tiger, and a wolf.

The first phase of ticket sales started on 14 September , The general visa policy of Russia did not apply to participants and spectators, who were able to visit Russia without a visa right before and during the competition regardless of their citizenship. A Fan-ID was required to enter the country visa-free, while a ticket, Fan-ID and a valid passport were required to enter stadiums for matches.

Fan-IDs also granted World Cup attendees free access to public transport services, including buses, and train service between host cities. Fan-ID was administered by the Ministry of Digital Development, Communications and Mass Media , who could revoke these accreditations at any time to "ensure the defence capability or security of the state or public order". The official match ball of the World Cup group stage was " Telstar 18 ", based on the name and design of the first Adidas World Cup ball from It was introduced on 9 November After the group stage, "Telstar Mechta" was used for the knockout stage.

The word mechta Russian: The difference between Telstar 18 and Mechta is the red details on the design. Its music video was released on 8 June Thirty-three footballers who are alleged to be part of the steroid program are listed in the McLaren Report. The choice of Russia as host has been challenged. Controversial issues have included the level of racism in Russian football, [] [] [] and discrimination against LGBT people in wider Russian society.

Allegations of corruption in the bidding processes for the and World Cups caused threats from England's FA to boycott the tournament. Garcia , a US attorney, to investigate and produce a report on the corruption allegations.

Eckert's summary cleared Russia and Qatar of any wrongdoing, but was denounced by critics as a whitewash. On 3 June , the FBI confirmed that the federal authorities were investigating the bidding and awarding processes for the and World Cups. In response to the March poisoning of Sergei and Yulia Skripal , British Prime Minister Theresa May announced that no British ministers or members of the royal family would attend the World Cup, and issued a warning to any travelling England fans.

The British Foreign Office and MPs had repeatedly warned English football fans and "people of Asian or Afro-Caribbean descent" travelling to Russia of "racist or homophobic intimidation, hooligan violence and anti-British hostility". At the close of the World Cup Russia was widely praised for its success in hosting the tournament, with Steve Rosenberg of the BBC deeming it "a resounding public relations success" for Putin, adding, "The stunning new stadiums, free train travel to venues and the absence of crowd violence has impressed visiting supporters.

Russia has come across as friendly and hospitable: All the foreign fans I have spoken to are pleasantly surprised. FIFA President Gianni Infantino stated, "Everyone discovered a beautiful country, a welcoming country, that is keen to show the world that everything that has been said before might not be true. A lot of preconceived ideas have been changed because people have seen the true nature of Russia. The elimination of the US national team in qualifying led to concerns that US interest and viewership of this World Cup would be reduced especially among "casual" viewers interested in the US team , especially noting how much Fox paid for the rights, and that US games at the World Cup peaked at During a launch event prior to the elimination, Fox stated that it had planned to place a secondary focus on the Mexican team in its coverage to take advantage of their popularity among US viewers factoring Hispanic and Latino Americans.

Fox stated that it was still committed to broadcasting a significant amount of coverage for the tournament. In February , Ukrainian rightsholder UA: PBC stated that it would not broadcast the World Cup. This came in the wake of growing boycotts of the tournament among the Football Federation of Ukraine and sports minister Ihor Zhdanov. Broadcast rights to the tournament in the Middle East were hampered by an ongoing diplomatic crisis in Qatar over alleged support of extremist groups.

Qatar is the home country of the region's rightsholder, beIN Sports. On 2 June , beIN pulled its channels from Du and Etisalat , but with service to the latter restored later that day. Etisalat subsequently announced that it would air the World Cup in the UAE, and continue to offer beIN normally and without interruptions. On 12 July , FIFA stated that it "has engaged counsel to take legal action in Saudi Arabia and is working alongside other sports rights owners that have also been affected to protect its interests.

From Wikipedia, the free encyclopedia. For other competitions of that name, see World Cup disambiguation. For the video game, see FIFA Not a FIFA member. Bronnitsy , Moscow Oblast Australia: Kazan , Republic of Tatarstan Belgium: Krasnogorsky , Moscow Oblast Brazil: Sochi , Krasnodar Krai Colombia: Verkhneuslonsky , Republic of Tatarstan Costa Rica: Roshchino , Leningrad Oblast [79] Denmark: Anapa , Krasnodar Krai Egypt: Grozny , Chechen Republic England: Repino , Saint Petersburg [80] France: Istra , Moscow Oblast Germany: The Ocean Tower now known as Ali'i Tower was completed in And, in what was among the many firsts for the Hawaiian Village, Kaiser erected the first public geodesic dome showroom in Honolulu.

The showroom opened on February 17, during a 2. Kaiser also developed the 5-acre man-made lagoon fronting the Hawaiian Village. The purchase included close to 18 acres of property, plus another three acres of adjacent property. The Hilton Hawaiian Village has been the site of many milestones throughout Hawaii's history and popular culture, including:. Burns and Henry J. The Tapa Room, gardens, and three swimming pools are also completed. Geodesic dome showroom is erected on January 15 in just 20 hours.

Ed Hastings becomes the new manager of the Hilton Hawaiian Village. More than 16, colorful tiles are used to complete the mosaic. The total number of hotel rooms becomes 2, The project was part of the overall Village master plan, and included the construction of the Main Lobby building.

Hilton Hawaiian Village, now offering 2, guestrooms, celebrates a grand reopening. A Waikiki tradition is born when the resort launches a weekly fireworks show on Friday night over Waikiki Beach.

IRONMAN 70.3 Indian Wells La Quinta

Leave a Reply